Feature
The Ghost of Ayn Rand as a Climate Activist?
|
Remember the time a famous architect secretly designed a public housing project, and then blew the place up because the complex was not built to his specifications?
InDepthNH.org (https://indepthnh.org/tag/merrimack-station/)
Remember the time a famous architect secretly designed a public housing project, and then blew the place up because the complex was not built to his specifications?
Second, when real-time prices soar to these heights it means something is wrong with the bulk power transmission system and there is danger of rolling blackouts or, worse, an uncontrolled system failure.
It was a frigid morning, and a train carrying 80 carloads of coal was on its way to Merrimack Station, New England’s last major coal-fired power plant.
Seventeen people arrested in Bow five weeks ago circled up with supporters outside Concord District Court Monday morning to prepare for arraignment on misdemeanor charges stemming from a demonstration at Merrimack Station.
Maybe, just maybe, after paying hundreds of millions of dollars and waiting 24 years, New Hampshire’s residential utility customers are about to get some real benefits out of the 1996 Restructuring Act. But not if Eversource has anything to say about it.